Currently viewing: Architecture

Case Studies – High Performance Glazing

VIEW

Integrated Solutions Showcase Building 669 Testbed

VIEW

Kieren Timberlake Building 661 Integrated Design Process Overview

The strategic focus of CBEI is on full-spectrum retrofit of existing average size commercial and multi-family residential buildings. This report reviews the integrated design process for the CBEI headquarters building.

VIEW

Energy Retrofit Market Opportunities

VIEW

Brief: Architects, Engineers, Construction Managers Platform

VIEW

Architecture, Style, and the Design of Energy Efficient Buildings

The EEB Hub is working to address how energy consumption influences architectural style.

VIEW

Navy Yard Building 661: Advanced Energy Retrofit Living Laboratory

A key objective of the EEB Hub is to provide successful demonstrations of integrated building design methods that lead to deep, reliable cuts in energy use while improving overall asset value overall in real estate markets.

VIEW

Environmental Satisfaction in Open-Plan Environments

Organisations and their facilities managers are under pressure to reduce the space allocation to individuals in open-plan offices, as a means to reduce costs.

VIEW

Survey of local and national design teams to identify gaps in building design and delivery process with specific emphasis on Integrated Design

This report evaluates literature on the current theories of “integrated design” and conducted a series of interviews with architects, engineers and others involved in commercial retrofits.

VIEW

Multimedia Education Platform and Pilot Course Report

The original purpose of this subtask was to identify “…material and a delivery format suitable for a multimedia documentary on the technology, tools and processes under consideration for inclusion in the 661 retrofit.”

VIEW